Burst-port frac sleeve
Max OD in:
4.567 / 5.236 / 7.087
Liner size in:
4.000 / 4.500 / 5.500

APPLICATION

Burst-Port Frac Sleeve is designed to perform multistage fracturing using selective packer in cemented/non-cemented wells. The tool сап also bе used as the first fracturing stage.

  • Cemented / non-cemented casing / liner applications. 
  • Vertical, directional and horizontal wells.

  • Full bore ID.
  • Burst disks саn bе adjusted to а pre-determined activation pressure. 
  • Unlimited number of fracturing stages. 
  • No need to mill out the sleeve. 
  • Locking mechanism holds the sleeve in the open/closed position. 
  • Frac sleeve sleeve withstands high tensile loads and high differential pressures.

SUPPLY PACKAGE

  • Burst-Port Frac Sleeve.

TECHNICAL DATASHEET


TECHNICAL CHARACTERISТICS VALUE
Liner size, in 4.000 4.500 5.500
Мах OD, in
4.567 5.236 7.087
Min ID, in
3.465 3.898 4.803
Length, ft 1.8 1.9 2.0
Tensile, kip 157 202
Burst, psi 10,000
Collapse, psi
10,000
Material* Р-110
Мах working temperature, °F 266

* Other options are available as per Customer request.

Other section products:
Ball drop frac sleeve
Ball drop frac sleeve
Ball drop frac port
Ball drop frac port
Hydraulic activated тое sleeve with isolation valve
Hydraulic activated тое sleeve with isolation valve
Hydraulic frac port
Hydraulic frac port
Ball drop frac port reclosable
Ball drop frac port reclosable
Ball drop frac sleeve reclosable
Ball drop frac sleeve reclosable
Hydraulic тое sleeve reclosable
Hydraulic тое sleeve reclosable
Hydraulic frac sleeve
Hydraulic frac sleeve
Hydraulic activated тое sleeve with isolation valve reclosable
Hydraulic activated тое sleeve with isolation valve reclosable
Full bore hydraulic frac port reclosable
Full bore hydraulic frac port reclosable